88 | Installation
Storage system | Installation manual
6.11.3 Connecting the string inverter to the cable
harness
6.28:
String inverter terminals
[1]
DC+
[2]
DC–
[3]
CAN In
[4]
CAN Out
[5]
AC Out
▶
Procedure
1. Connect the solar generator cable to the DC+
terminal
2. Connect the solar generator cable to the DC-
terminal (green point on the string inverter
terminal)
3. Connect the battery converter CAN In cable to the
CAN In terminal (3) on the string inverter
4. Connect the CAN Out cable
5. Connect the AC Out cable
■
The string inverter is connected to the cable harness.
(3) (4) (5)
(1) (2)
English
Bosch Power Tec GmbH