Operator Panels - Siemens sinamics g120 Operating Instructions Manual

Cu250s-2 control units
Hide thumbs Also See for sinamics g120:
Table of Contents

Advertisement

Installing

3.4 Operator panels

The factory settings of the terminals for USS/CANopen and PROFIBUS/PROFINET
described above correspond to the following default settings:
● p0015 = 12 (setting in STARTER or Startdrive: "Standard I/O with analog setpoint")
● p0015 = 7 (setting in STARTER or Startdrive: "Fieldbus with data set switchover")
Further default settings can be found in the Operating Instructions:
Manuals for the Control Unit
(http://support.automation.siemens.com/WW/view/en/30563628/133300)
Wiring the terminal strip in compliance with EMC
1. If you use shielded cables, then you must connect the shield to the mounting plate of the
control cabinet or with the shield support of the inverter through a good electrical
connection and a large surface area.
Further information is provided in the Internet:
EMC installation guideline
(http://support.automation.siemens.com/WW/view/en/60612658)
2. Use the shield connection plate (order number 6SL3264-1EA00-0LA0) of the Control Unit
as strain relief.
3.4
Operator panels
Operator panel
An operator panel is used to commission, troubleshoot and control the inverter, as well as to
back up and transfer the inverter settings.
The Intelligent Operator Panel (IOP) is available for snapping on to the Control Unit or as
handheld with a connection cable to the Control Unit. The graphics-capable plain text display
of the IOP enables intuitive operation and diagnostics of the inverter.
The IOP is available in two versions:
● With European languages
● With Chinese, English and German
Additional information about the compatibility of the IOP and Control Units is available in the
Internet:
Compatibility of the IOP and Control Units
(http://support.automation.siemens.com/WW/view/en/67273266)
The BOP-2 is an operator panel for snapping on to the Control Unit. The BOP-2 has a two-
line display for operation and diagnostics of the inverter.
Operating Instructions of the BOP-2 and IOP operator panels:
14
Overview of the manuals (Page 29)
Compact Operating Instructions, 01/2016, A5E37058195B AA
CU250S-2 Control Units

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents