Room Control Combination - Siemens Synco700 RMK770 Documentation Handbook

Series modular boiler sequence controller
Table of Contents

Advertisement

Settings
Tip
Note
Behavior after a
power failure
Extra configuration
Settings
Communication
Example with
2 heating circuits
152/226
Building Technologies
HVAC Products
Main menu > Commissioning > Settings > ... or
Main menu > Settings > Heating circuit > Space heating
Operating line
Timer function*
* This setting does not apply to the QAW740 room unit; in that case, the setting is made directly on the room
unit
The activated timer can be stopped by changing the room operating mode (e.g. via the
room operating mode selector).

10.4.7 Room control combination

The heating circuit of the RMK770 can be combined with a heating circuit of some other
controller. This combination of 2 room control systems is required, for example, when 1
heating circuit is used for the underfloor heating system and 1 for the radiators. Another
example is the combination of ventilation and heating in a room (e.g. in a hall).
If only the time program shall be jointly used, this can be done without a room control
combination. In that case, the time switch of the heating circuit is to be operated as the
master or slave. For more detailed information, refer to section 5.1 "Time switch".
In the event of a power failure, the operating mode of the slave is on Comfort
master sends another signal via bus.
For more detailed information about ventilation, refer to the Basic Documentation on the
RMU7... (P3140).
Main menu > Commissioning > Extra configuration > Heating circuit > Functions
Operating line
Room control combination
There are no settings required.
The room operating mode selector and the setpoints (if external) must be set on the
master.
Main menu > Commissioning > Communication > Room heating circuit
Operating line
Geographical zone (apartment)
Communication is described in chapter 13 "Communication".
Problem:
The basic load is covered by a heating circuit with weather-compensated control and
the load-dependent part by a second heating circuit with or without room influence. The
2 heating circuits shall operate in parallel and be controlled by a common switching
program or a room operating mode selector.
Boiler Sequence Controller RMK770
10 Heating circuit control
Range
0...720 min
Range
Master / Slave external
setpoint / Slave internal
setpoint
Range
1...126
Factory setting
60 min
until the
Factory setting
Master
Factory setting
1
CE1P3132en
01.03.2005

Advertisement

Table of Contents
loading

Table of Contents