Table Of Contents - ABB REC650 Commissioning Manual

Relion 650 series bay control
Hide thumbs Also See for REC650:
Table of Contents

Advertisement

Commissioning Manual

Table of contents

Section 1 Introduction.......................................................................7
This manual........................................................................................7
Intended audience..............................................................................7
Product documentation.......................................................................8
Product documentation set............................................................8
Document revision history.............................................................9
Related documents........................................................................9
Symbols and conventions.................................................................10
Safety indication symbols............................................................10
Manual conventions.....................................................................11
Section 2 Available functions.........................................................13
Back-up protection functions............................................................13
Control and monitoring functions......................................................14
Designed to communicate................................................................17
Basic IED functions..........................................................................17
Section 3 Starting up......................................................................19
Factory and site acceptance testing.................................................19
Commissioning checklist..................................................................19
Checking the power supply..............................................................20
Energizing the IED............................................................................20
Checking the IED operation.........................................................20
IED start-up sequence.................................................................20
Writing an application configuration to the IED.................................25
Checking CT circuits.........................................................................26
Checking VT circuits.........................................................................26
Checking the RTXP test switch .......................................................27
Checking binary input and output circuits.........................................28
Binary input circuits.....................................................................28
Binary output circuits...................................................................28
Checking optical connections...........................................................28
station communication....................................................29
Setting the station communication....................................................29
Verifying the communication............................................................29
Section 5 Testing IED operation.....................................................31