The charger should be installed in a location that meets the following requirements:
1. Never install the equipment near liquids or in an excessively damp environment.
2. The charger must be installed in a room with proper ventilation.
3. Avoid using equipment in location with corrosive gases (e.g. over flooded Lead Acid batteries) and dust.
2.2

Mounting

The ULTRA SERIES CHARGER is designed with
simple installation in mind. The charger is wall
mountable using four #10 bolts. To mount the
Ultra series charger on the wall, mark the drill
points on the wall per the mounting dimensions
shown in Figure 2. Install the anchors on the 4
marked spots. Place the unit on the wall to
match the mounting holes with anchor spots.
Install four #10 bolts on the wall using
appropriate mounting hardware.
Refer to figure 2 for mounting dimensions.
After the Ultra series charger is mounted, the input, output and alarm connections can be made.
3.

Electrical Connections

Unscrew the front cover to access the Input, Output and Alarm connectors. See the Figure 3 and Figure 4 in
section 3.1 and 3.2 on the next page for reference.
CAUTION : All wiring must be performed by a qualified personnel.