Duct Design - Toshiba ras-m16g3dv-e Service Manual

Up to 4.5kw cooling capasity
Hide thumbs Also See for ras-m16g3dv-e:
Table of Contents

Advertisement

Heat insulating process
• As shown in the figure, cover the flexible hose and hose band with the attached heat insulator up to the bottom of the indoor unit without gap.
• Cover the drain pipe seamlessly with a heat insulator locally procured so that it overlaps with the attached heat insulator of the drain connecting section.

10-6. Duct design

Arrangement
Referring to the following dimensions, manufacture duct at the local site.
M07,10,13G3DV
<Under air intake>
<Back air intake>
Wrap the attached heat insulator seamlessly
from the surface of the indoor unit.
Heat insulator of the
Heat insulator
drain connecting
(Locally procured)
section (Accessory)
Banding band (Locally procured)
* Direct the slits and seams of the heat insulator
upward to avoid water leakage.
– 55 –
M16G3DV
<Under air intake>
<Back air intake>

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents