Installation Space - Toshiba ras-m16g3dv-e Service Manual

Up to 4.5kw cooling capasity
Hide thumbs Also See for ras-m16g3dv-e:
Table of Contents

Advertisement

Installation under high-humidity atmosphere
In some cases including the rainy season, especially inside of the ceiling may become high-humidity atmosphere (dew-point temperature: 23 °C or higher).
1. Installation to inside of the ceiling with tiles on the roof
2. Installation to inside of the ceiling with slated roof
3. Installation to a place where inside of the ceiling is used for pathway to intake the fresh air
4. Installation to a kitchen
• In the above cases, additionally attach the heat insulator to all positions of the air conditioner, which come to contact with the high-humidity atmosphere.
• Apply also a sufficient heat insulation to the duct and connecting part of the duct.
[Reference]
Condensation test
conditions

Installation space

Refrigerant piping
Air outlet
Ceiling
100
A
100 or
more
Access port (Ceiling opening)
Floor surface
Access port
A
Air outlet
<Under air intake>
Ceiling
27 °C dry bulb temperature
Indoor side:
24 °C wet bulb temperature
Air volume:
Low air volume, operation time 4 hours
Drain piping
450
Air inlet
50 or more
450
Access port (Ceiling opening)
Model type
M07,10,13G3DV
M16G3DV
<Back air intake>
– 48 –
A
1,250
1,450
Air inlet
300 or more
Ceiling
450
Access port (Ceiling opening)
Air inlet
Ceiling
450
Access port (Ceiling opening)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents