Water connection spring
adapter
Make sure that the water connection
spring adapter engages correctly when
a basket or injector unit is inserted in
the machine. It must be 4-5 mm higher
than the water connection inlet in the
machine.
If it is not, adjust the adapter
accordingly.
^ Loosen lock ring a.
^ Push up adapter b.
^ Tighten lock ring c.
Areas of application

Height adjustable top basket

The top basket can be adjusted above
and below the middle position by 2 cm.
Depending on the position of the top
basket and the inserts used, the
baskets can accommodate vessels and
instruments of the following heights:
Example: Top basket O 188/1 and
bottom basket U 874/1 without
inserts:
Top basket
Top basket
position
height (cm)
Top
max. 15.5
Middle
max. 17.5
Bottom
max. 19.5
The height available in the right
hand side of the top basket is limited
by the salt reservoir connection
point.
To adjust the top basket:
^ Pull out the top basket until a
resistance is felt; lift from the runners
and remove.
^ Unscrew the roller bearings on both
sides of the basket with a suitable
spanner and reposition as required.
Bottom
basket
height (cm)
max. 28.5
max. 26.5
max. 24.5