Sapling SALG Series Installation Manual page 91

Wireless clock
Hide thumbs Also See for SALG Series:
Table of Contents

Advertisement

Double Mount Installation - Round SlimLine/Aluminum Clock - Battery Powered
5) Insert the #8 screws through the mounting plate
and into the anchors.
6) Attach the base of the pole to the mounting plate so that the lip is on the top of the base, and the
holes for the screws are on the bottom of the base. Hang the base on the mounting plate, attach the
wires from the bottom of the pole to the wires in the gang box, then screw the other side of the base
onto the mounting plate using the two black screws you set aside before.
2
2
5 5B
1
1
WALL
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
5B) If you are installing the clock atop an gang box,
use the green screw to attach a grounding wire to
the mounting plate.
2
1
CEILING
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
6
91

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SALG Series and is the answer not in the manual?

This manual is also suitable for:

Sal series

Table of Contents