GAH electrastream User And Installation Manual page 49

Single and twin coil models
Hide thumbs Also See for electrastream:
Table of Contents

Advertisement

CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Impor
Impor
tant Information
tant Information
-----------------------------------------
-----------------------------------------
Important Information
Impor
Impor
tant Information
tant Information -----------------------------------------
-----------------------------------------
----------------------------------------- 4
Section 1 Intr
Section 1 Introduction
Section 1 Intr
Section 1 Intr
Section 1 Intr
oduction
oduction
oduction
oduction
CAUTION
1-1 Introduction ---------------------------------------------- 5
The main supply must be turned
1-2 System Layout ------------------------------------------- 8
OFF and water drained from the
Accumulator before lowering the
1-3 Parts Supplied ------------------------------------------- 11
charge pressure, failure to do so
1-4 The Electrastream System ------------------------------- 12
could result in damage to the
1-5 Tri Core Heater Operation -------------------------------- 13
diaphragm.
If in doubt consult GAH (Heating
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Controls
Section 2 Operator Contr
Products).
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
AIR CHARGE VALVE
- SCHRADER
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
BUTYL DIAPHRAGM
2-6 Servicing ------------------------------------------------ 22
Section 3 T
Section 3 T
Section 3 T
Section 3 T
Section 3 Technical Information
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
Fig. 5-1a Accumulator Pressure
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & Safety
Health & Safety
Health & Safety
Health & Safety
Health & Safety ------------------------------
------------------------------ Inside Front Cover
------------------------------
------------------------------
------------------------------
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
STAGE 9 - ACCUMULATOR PRESSURE
Accumulators are supplied by GAH with a preset air charge of 2 Bar (28/30psi). The
Combination Valve supplied with the Electrastream Plus has an integral pressure
reducing valve fixed at 3.5 Bar. Therefore there is a pressure differential of 1.5 bar
between the system pressure and the air charge of the Accumulator.
When the incoming mains pressure is less than 3.5 Bar the pressure differential will be
less than 1.5 Bar and the Accumulator will not fill sufficiently, therefore it may be
necessary to lower the Accumulator air charge pressure.
The procedure for changing the Accumulator pressure is given below, this can be done
before the system has been filled. It may be done after the system has been filled and
tested, providing the incoming main has been turned OFF and the water drained from the
ols
ols
ols
ols
Accumulator. Failure to do this may result in false pressure reading and damage to the
butyl diaphragm.
If mains pressure is 3.5 Bar or above, changing the Accumulator charge pressure will not
be necessary.
Adjusting Air Pressure
9-1 Record mains pressure.
9-2 Turn main supply OFF.
9-3 Turn on cold outlets to empty Accumulator.
9-4 Remove black cap from top of Accumulator check/confirm Accumulator pressure
with pressure gauge.
9-5 Lower air charge so that is 1 to 1.5 Bar below mains pressure.
Minimum Accumulator pressure is 0.8 Bar.
STAGE 10 - HANDING OVER
10.1 Complete the Guarantee Form, the top sheet of this MUST be sent to GAH (HEATING
PRODUCTS) LIMITED or the Electrastream can be registered on-line at
www.gah.co.uk.
10.2 Complete the Benchmark Logbook.
10.3 The Installer should re-check the system and ensure it is completely satisfactory
before demonstrating to the end user.
10.4 The end user should be aware of the following:-
1. The most cost effective use of the Electrastream system using economy and
standard tariffs.
2. How to set the temperature of the tap hot water (Mixing Valve).
3. How to set all Electrastream Controller functions.
4. How to set room thermostat.
5. The function of the Pressure Relief Valves and Combination Valve and that over
pressure will cause steam and scalding water to be emitted from the discharge
pipes.
6. That the Tundish is supplied as a visual identification for over pressure.
7. The procedure to follow in the event of over pressure. Refer to Fault Finding
(section 7).
10.5 This manual and supplements must be left with the end user together with a copy of
the completed Guarantee Form.
IMPORTANT
COMMISSIONING
COMMISSIONING
COMMISSIONING
CONTENTS
CONTENTS
CONTENTS
COMMISSIONING
COMMISSIONING
CONTENTS
CONTENTS
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
2 OPERA
2 OPERA
2 OPERA
2 OPERA
2 OPERATOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
4 INST
4 INST
ALLA
ALLA
4 INST
4 INST
4 INSTALLA
ALLA
ALLATION
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
7 F
7 F
7 F
7 FAUL
7 F
AUL
AUL
AUL
AULT FINDING
T FINDING
T FINDING
T FINDING
T FINDING
HEAL
HEAL
TH & SAFETY
TH & SAFETY
HEAL
HEALTH & SAFETY
HEAL
TH & SAFETY
TH & SAFETY
5
5
5
5
5
TION
TION
TION
TION
TION
TION
TION
TION
5 5 5 5 5
49
3

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for GAH electrastream

Table of Contents