GAH electrastream User And Installation Manual page 27

Single and twin coil models
Hide thumbs Also See for electrastream:
Table of Contents

Advertisement

CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Impor
Impor
tant Information
tant Information
-----------------------------------------
-----------------------------------------
Important Information
Impor
Impor
tant Information
tant Information -----------------------------------------
----------------------------------------- 4
-----------------------------------------
Section 1 Intr
Section 1 Introduction
Section 1 Intr
Section 1 Intr
Section 1 Intr
oduction
oduction
oduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied ------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
CLEAR AREA REQUIRED
FOR TPRV REMOVAL
1-5 Tri Core Heater Operation -------------------------------- 13
250 x 100
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Controls
ols
ols
ols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 Technical Information
Section 3 T
Section 3 T
Section 3 T
Section 3 T
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
WATER MAINS IN 22mm
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
5-1 Commissioning ----------------------------------------- 47
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & Safety ------------------------------
Health & Safety
Health & Safety
Health & Safety
Health & Safety
------------------------------
------------------------------ Inside Front Cover
------------------------------
------------------------------
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
3-2.3 Pre-plumbed Twin Coil BETP210 System Dimensions
Fig. 3-2c Twin Coil BETP210 Pre-Plumbed Dimensions
IMPORTANT
TECHNICAL INFORMATION
TECHNICAL INFORMA
TECHNICAL INFORMA
TECHNICAL INFORMA
TECHNICAL INFORMA
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
2 OPERA
2 OPERA
2 OPERA
2 OPERATOR CONTROLS
2 OPERA
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
CLEAR AREA REQUIRED
FOR TRI-CORE HEATER
REMOVAL 510 x 200
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
3 TECHNICAL INFORMA
4 INST
4 INST
4 INST
4 INST
4 INSTALLA
Weight Empty 172kg
Weight Full
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
HEATING RETURN - 22mm
HEATING FLOW - 22mm
DHW CONNECTION - 22mm
PIPES CAN PASS UNDER
BETWEEN LEGS
7 F
7 F
7 F
7 F
7 FAUL
HEAL
HEAL
HEAL
HEALTH & SAFETY
HEAL
TION
TION
CONTENTS
TION
CONTENTS
CONTENTS
3
3
3
TION
CONTENTS
CONTENTS
3
3
3 3 3 3 3
TION
TION
TION
TION
ALLA
ALLA
TION
TION
ALLA
ALLATION
TION
TION
382kg
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
AUL
AUL
AULT FINDING
AUL
T FINDING
T FINDING
T FINDING
T FINDING
TH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
27
3

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for GAH electrastream

Table of Contents