GAH electrastream User And Installation Manual page 19

Single and twin coil models
Hide thumbs Also See for electrastream:
Table of Contents

Advertisement

CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Impor
Impor
tant Information
tant Information
-----------------------------------------
-----------------------------------------
Impor
Important Information
Impor
tant Information
tant Information -----------------------------------------
----------------------------------------- 4
-----------------------------------------
Section 1 Intr
Section 1 Intr
Section 1 Introduction
Section 1 Intr
Section 1 Intr
oduction
oduction
oduction
oduction
1-1 Introduction ---------------------------------------------- 5
1-2 System Layout ------------------------------------------- 8
1-3 Parts Supplied ------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Note:-
Self Test
After 3am each day the unit carries out a
Section 2 Operator Controls
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
ols
ols
ols
ols
self test period for approx. 30 minutes.
2-1 System Control ------------------------------------------ 14
This can be overridden if required.
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
2-4 Temperature & Pressure Relief Discharge ---------------- 22
2-5 Thermostatic Mixing Valve ------------------------------ 22
2-6 Servicing ------------------------------------------------ 22
Section 3 T
Section 3 T
Section 3 T
Section 3 T
Section 3 Technical Information
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
IMPORTANT
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Operating the Electrastream during
4-1 Building Control ----------------------------------------- 31
normal tariffs will increase running
4-2 Electrical ------------------------------------------------ 31
costs.
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
Note:-
4-5 Expansion Discharge ------------------------------------ 40
* The electricity supply company has to
4-6 System Pressure ---------------------------------------- 43
make special arrangements to the
4-7 Electrastream Connections - ---------------------------- 44
property’'s electrical supply to enable
Electrastream to be used during both ‘' o ff-
peak’' and ‘'normal’' tariffs- consult the
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
installing electrician.
5-1 Commissioning ----------------------------------------- 47
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
7-1 Fault Finding -------------------------------------------- 52
Health & Safety
Health & Safety
Health & Safety
Health & Safety
Health & Safety ------------------------------
------------------------------
------------------------------
------------------------------
------------------------------ Inside Front Cover
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
2-2.7 Setting Heat and Hot Water Requirements
Figure below shows a 24 hour clock with typical use of the Electrastream during ‘'Off-
Peak’' economy 10 settings.
All times fall within Economy Tariff
Start 1 - 03.00 (3am)
Start 2 - 14.00 (2pm)
Stop 1 - 05.00 (5am)
Stop 2 - 16.00 (4pm)
‘'Boost
’' can be used at any time during Economy or *Normal Tariff to provide heating
and hot water.
To turn hot water and heating OFF during ON periods (auto) press
require switching to Auto again when required.
To turn heating only OFF during ON period (auto) and during ‘'Boost’' press
require switching to Auto again when required.
To turn hot water only ON during OFF periods (auto) press
to Auto again when required.
To turn hot water and heating ON during OFF periods (auto) press
will require switching to Auto again when required.
IMPORTANT
OPERATOR CONTROLS
OPERA
OPERA
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
CONTENTS
CONTENTS
CONTENTS
OPERA
OPERA
TOR CONTROLS
CONTENTS
CONTENTS
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
SELF TEST
2 OPERATOR CONTROLS
2 OPERA
2 OPERA
2 OPERA
2 OPERA
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
Midnight
24
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
4 INST
4 INST
4 INST
4 INST
4 INSTALLA
Midday
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
Start 3 - 20.00 (8pm)
Stop 3 - 21.30 (9.30pm)
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
twice. It will
7 F
7 F
7 F
7 F
7 FAUL
AUL
AUL
AUL
AULT FINDING
. It will require switching
then
HEAL
HEAL
TH & SAFETY
TH & SAFETY
HEAL
HEALTH & SAFETY
HEAL
TH & SAFETY
TH & SAFETY
2
2
2
2
2
2 2 2 2 2
TION
TION
TION
TION
ALLA
ALLA
TION
TION
ALLA
ALLATION
TION
TION
. It will
T FINDING
T FINDING
T FINDING
T FINDING
. Both
19
3

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for GAH electrastream

Table of Contents