Fault Finding; Introduction; Operator Controls Tor Controls; Technical Informa - GAH electrastream User And Installation Manual

Single and twin coil models
Hide thumbs Also See for electrastream:
Table of Contents

Advertisement

CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
3-2
Dimensions
Impor
Impor
tant Information
tant Information
-----------------------------------------
-----------------------------------------
Important Information
Impor
Impor
tant Information
tant Information -----------------------------------------
-----------------------------------------
----------------------------------------- 4
Section 1 Introduction
Section 1 Intr
Section 1 Intr
Section 1 Intr
Section 1 Intr
oduction
oduction
oduction
oduction

1-1 Introduction ---------------------------------------------- 5

COMPRESSION FITTINGS ARE SUPPLIED TO ADAPT THE
1-2 System Layout ------------------------------------------- 8
CYLINDER TAPPINGS TO THE PIPE SIZES SHOWN.
1-3 Parts Supplied ------------------------------------------- 11
1-4 The Electrastream System ------------------------------- 12
1-5 Tri Core Heater Operation -------------------------------- 13
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Contr
Section 2 Operator Controls
Section 2 Operator Contr
ols
ols
ols
ols
2-1 System Control ------------------------------------------ 14
2-2 Electrastream Control Unit ------------------------------- 16
2-3 Shut Off Valves ------------------------------------------ 20
CLEAR AREA REQUIRED
FOR TPRV REMOVAL
2-4 Temperature & Pressure Relief Discharge ---------------- 22
250 x 100
2-5 Thermostatic Mixing Valve ------------------------------ 22

2-6 Servicing ------------------------------------------------ 22

Section 3 T
Section 3 T
Section 3 T
Section 3 T
Section 3 Technical Information
echnical Information
echnical Information
echnical Information
echnical Information
3-1 Specifications ------------------------------------------- 23
3-2 Dimensions --------------------------------------------- 25
3-3 Wiring --------------------------------------------------- 29
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
Section 4 Installation
4-1 Building Control ----------------------------------------- 31
4-2 Electrical ------------------------------------------------ 31
4-3 Hot Water System --------------------------------------- 33
4-4 Heating System ----------------------------------------- 37
4-5 Expansion Discharge ------------------------------------ 40
4-6 System Pressure ---------------------------------------- 43
4-7 Electrastream Connections - ---------------------------- 44
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning
Section 5 Commissioning

5-1 Commissioning ----------------------------------------- 47

Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
Section 6 Servicing
6-1 Routine Service ----------------------------------------- 50
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding
Section 7 Fault Finding

7-1 Fault Finding -------------------------------------------- 52

C
i l y
d n
r e
M
d o
l e
C
p a
c a
y t i
B
E
1 L
0 3
1
0 3
r t i l
s e
Health & Safety ------------------------------
Health & Safety
Health & Safety
Health & Safety
Health & Safety
------------------------------
------------------------------
------------------------------
------------------------------ Inside Front Cover
B
E
1 L
0 5
1
0 5
r t i l
s e
BEFORE STARTING THE INSTALLATION OF THE ELECTRASTREAM CHECK ALL COMPONENTS HAVE
BEEN DELIVERED AND ARE IN SATISFACTORY CONDITION - Refer to 1-3 .
3-2.1 Cylinder Dimensions - Single Coil
ØB
32.5°
32.5°
90°
HOT WATER TO
TAPS -22mm
22mm
TPRV
TUNDISH
EXPANSION
DISCHARGE
HEATING
FLOW
-22mm
HEATING
RETURN
-22mm
C
l i o
C
l i o
A
S
r u
a f
e c
R
i t a
g n
. 0
7 6
m
²
7 1
2 .
k 8
W
9
1 8
. 0
8 7
m
²
7 1
4 .
k 6
W
1 1
9 0
IMPORTANT
Fig. 3-2a Single Coil Cylinder Dimensions
TECHNICAL INFORMATION

TECHNICAL INFORMA

TECHNICAL INFORMA
TECHNICAL INFORMA
TECHNICAL INFORMA
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
1 INTRODUCTION
Note
Allow sufficient access for cylinder servicing and
replacement. Recommended at least 100mm clearance
all round and above.
2 OPERATOR CONTROLS
2 OPERA
2 OPERA
2 OPERA
2 OPERA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMA
3 TECHNICAL INFORMATION
CLEAR AREA REQUIRED
FOR TRI-CORE HEATER
REMOVAL
510 x 200
22.5°
COLD MAINS SUPPLY
IN -22mm
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
5 COMMISSIONING
ELECTRASTREAM
COLD TO TAPS
-22mm
ELECTRASTREAM PLUS
TO ACCUMULATOR
-22mm
7 F
7 F
7 F
7 F
7 FAUL
*
W
e
g i
Ø
B
C
D
E
m
p
y t
HEAL
HEAL
HEALTH & SAFETY
HEAL
HEAL
Ø
5
0 5
2
9 4
4
2 4
8 2
g k
Ø
5
0 5
2
9 4
4
2 4
0 3
g k
TION
TION
TION
CONTENTS
CONTENTS
CONTENTS
3
3
3
TION
CONTENTS
CONTENTS
3
3
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
TOR CONTROLS
3 3 3 3 3
TION
TION
TION
TION

4 INST

4 INST
ALLA
ALLA
TION
TION
4 INSTALLA
4 INST
4 INST
ALLA
ALLATION
TION
TION
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
6 SERVICING
AUL
AUL
AULT FINDING
AUL
T FINDING
T FINDING
T FINDING
T FINDING
t h
*
W
e
g i
t h
F
l l u
TH & SAFETY
TH & SAFETY
TH & SAFETY
TH & SAFETY
1
2 5
g k
1
6 7
g k
* Cylinder only
25
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents