Installation
3.5.12 Check and carry out commissioning
ATTENTION!
Risk of disruptions due to moisture in the device.
If the device is moved from a cold environment into a hot
one, condensation may form inside.
☞ Wait about 2-3 hours before bringing the device into
service.
☞ Check that the mains plug is freely accessible or that
an all-pole isolating device (min. 3 mm contact gap) is
present.
☞ Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞ Ensure that air outlets are not closed or covered.
☞ With recirculating devices: Make sure that the ventilation
slots are free.
☞ Check the correct functioning of the device.
D "4. Operation" (page 96).
6002644_0 – 20.01.2016
95
Need help?
Do you have a question about the BKH 90 GL and is the answer not in the manual?