Dodge ram truck 3500 1996 Service Manual page 1058

Table of Contents

Advertisement

REMOVAL A N D INSTALLATION (Continued)
(7) With air hose attached to an adapter installed
in No.l spark plug hole, apply 620-689 kPa (90-100
psi) air pressure.
(8) Using
Valve
Spring
Compressor
Tool
MD-998772A with adaptor 6633, compress valve
spring and remove retainer valve locks and valve
spring.
(9) Install seals on the exhaust valve stem and
position down against valve guides.
(10) The intake valve stem seals should be pushed
firmly and squarely over the valve guide using the
valve stem as a guide. DO NOT force seal against top
of guide. When installing the valve retainer locks,
compress the spring only enough to install the locks.
(11) Follow the same procedure on the remaining 7
cylinders using the firing sequence 1-8-4-3-6-5-7-2.
Make sure piston in cylinder is at TDC on the valve
spring that is being removed.
(12) Remove adapter from the No.l spark plug
hole.
(13) Install rocker arms.
(14) Install covers and coil wire to distributor.
(15) Install air cleaner.
(16) Road test vehicle.
CYLINDER HE1DS
REMOVAL
(1) Disconnect the negative cable from the battery.
(2) Drain cooling system (refer to Group 7, Cooling
System for the proper procedures).
(3) Remove
the
intake
manifold-to-generator
bracket support rod. Remove the generator.
(4) Remove closed crankcase ventilation system.
(5) Disconnect the evaporation control system.
(6) Remove the air cleaner.
(7) Perform the Fuel System Pressure Release pro­
cedure (refer to Group 14, Fuel System). Disconnect
the fuel lines.
(8) Disconnect
accelerator
linkage and
i f so
equipped, the speed control and transmission kick-
down cables.
(9) Remove the return spring.
(10) Remove distributor cap and wires.
(11) Disconnect the coil wires.
(12) Disconnect heat indicator sending unit wire.
(13) Disconnect heater hoses and bypass hose.
(14) Remove cylinder head covers and gaskets.
(15) Remove intake manifold and throttle body as
an assembly. Discard the flange side gaskets and the
front and rear cross-over gaskets.
(16) Remove exhaust manifolds.
(17) Remove rocker arm assemblies and push rods.
Identify to ensure installation in original locations.
(18) Remove the head bolts from each cylinder
head and remove cylinder heads. Discard the cylin­
der head gasket.
(19) Remove spark plugs.
INSTALLATION
(1) Clean all surfaces of cylinder block and cylin­
der heads.
(2) Clean cylinder block front and rear gasket sur­
faces using a suitable solvent.
(3) Position the new cylinder head gaskets onto
the cylinder block.
(4) Position the cylinder heads onto head gaskets
and cylinder block.
(5) Starting at top center, tighten all cylinder head
bolts, in sequence, to 68 N-m (50 ft. lbs.) torque (Fig.
20). Repeat procedure, tighten all cylinder head bolts
to 143 N-m (105 ft. lbs.) torque. Repeat procedure to
confirm that all bolts are at 143 N-m (105 ft. lbs.)
torque.
Fig. 20 Cylinder Head Bolt Tightening
Sequence
CAUTION: When tightening the rocker arm bolts,
make sure the piston in that cylinder is NOT at
TDC. Contact between the valves and piston could
occur.
(6) Install push rods and rocker arm assemblies in
their original position. Tighten the > bolts to 28 N-m
(21 ft. lbs.) torque.
(7) Install the intake manifold and throttle body
assembly (refer to Group 11, Exhaust System and
Intake Manifold).
(8) Install exhaust manifolds. Tighten the bolts
and nuts to 34 N-m (25 ft. lbs.) torque.
(9) Adjust spark plugs to specifications (refer to
Group 8D, Ignition System). Install the plugs and
tighten to 41 N-m (30 ft. lbs.) torque.
(10) Install coil wires.
(11) Connect heat indicator sending unit wire.
(12) Connect the heater hoses and bypass hose.
(13) Install distributor cap and wires.
(14) Hook up the return spring.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ram truck 1500 1996Ram 1500 1996Ram truck 3500 1996

Table of Contents