Rotex HPSU compact 304 Installation And Maintenance Manual page 37

Hpsu compact solar tank with integrated interior heat pump unit
Hide thumbs Also See for HPSU compact 304:
Table of Contents

Advertisement

1. Check the cold water connection and, where necessary, fill
the potable water heat exchanger.
2. Turn power supply to ROTEX HPSU compact on.
3. Wait for the start phase.
4. After the start phase has completed, in heating mode, vent
the heating system, check the system pressure and adjust if
necessary (max. 3 bar, see chapter 7.5).
5. Carry out a visual inspection for leaks on all joints internally.
Seal any leaks that occur in a professional manner.
6. Set the dial on the controller to the required operating mode.
7. If a ROTEX
solar system is connected, commission this
in accordance with instructions provided. After disconnecting
the ROTEX
solar system, check the level in the buffer
storage tank once again.
FA ROTEX HPSU compact 4 - 06/2015
5
x
Start-up
37

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HPSU compact 304 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Hpsu compact 516Hpsu compact 308Hpsu compact 508

Table of Contents