Pre-Installation Guidelines; Safety Precautions - 3Com CoreBuilder 9000 Quick Installation Manual

7-slot chassis
Hide thumbs Also See for CoreBuilder 9000:
Table of Contents

Advertisement

6
7-S
C
Q
LOT
HASSIS
UICK
Preinstallation
Guidelines
I
G
NSTALLATION
UIDE
The 7-slot chassis is shipped with slots 1, 7, and 8 (bottom to top)
empty and power supply slot 1 (not shown) empty (Figure 4).
Figure 4 CoreBuilder 9000 7-slot Chassis as Shipped
7
6
5
4
3
2
1
The shipping box is reusable, place all packing materials in the chassis
shipping box and store the shipping box for future use.
This section provides safety precautions, installation guidelines, and
location requirements to help you install the CoreBuilder 9000
Enterprise Switch 7-slot chassis into your environment.

Safety Precautions

Read this section before you install the CoreBuilder 9000 Enterprise
Switch 7-slot chassis.
WARNING: The installation requires at least two people. Do not
attempt to install the chassis alone.
R
9
8
Empty slots 1, 7, and 8
CoreBuilder
9000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CoreBuilder 9000 and is the answer not in the manual?

Questions and answers

Table of Contents