Figure 3 Removing the Shipping Box
Inner tray
(includes documentation kit
and hardware mounting kit)
CoreBuilder ™ 9000
7-slot chassis
Shipping box
6 Remove the tab from the top of the plastic bag (not shown).
7 Remove the chassis from the plastic bag in the shipping box.
Using two people, lift the CoreBuilder 9000 chassis out of the plastic
bag and shipping box base and place the chassis on the floor in front
of the rack, table, or shelf that you plan to use.
8 Inspect the chassis for damage. If the chassis appears to be damaged,
repack it in the shipping box and contact your local supplier.
7-Slot Chassis Quick Installation Guide
R
9
8
7
6
5
4
3
2
1
Top
foam
packing
CoreBuilder
9000
Bottom
foam
packing
5