ParaBody 445104 Assembly Instructions Manual page 6

Second stack option
Table of Contents

Advertisement

FIGURE 6
3/8 X 1" 11
STEP 6
• (NOTE: STEP 6 is only if the 435101 LEG PRESS OPTION is installed otherwise proceed to STEP 7.)
• Assemble the previously removed 2" PULLEY to the bracket on the TOP BOOM using one 3/8 X 1" BOLT (11), one previously removed
3/8" WASHER, and one previously removed 3/8" LOCK NUT. See FIGURE 6.
• Assemble the previously removed ELASTIC CORD over the 2" PULLEY as shown in FIGURE 6.
19
12
STEP 7
• LOOSELY assemble one 4-1/2" PULLEY (6) to the TOP BOOM using one 3/8 X 2-3/4" BOLT (13), two 3/8" FLANGE SPACERS (12),
and one 3/8" LOCK NUT (19). See FIGURE 7.
3/8" WASHER
12
6
6
TOP BOOM
2" PULLEY
3/8" LOCK NUT
TOP BOOM
13 3/8 X 2-3/4"
FIGURE 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 445104

Table of Contents