ParaBody 445104 Assembly Instructions Manual page 12

Second stack option
Table of Contents

Advertisement

FIGURE 16
STEP 16
• CAREFULLY lift or tilt the TOP BOOM and insert all GUIDE RODS into the bushings. See FIGURE 16.
• With the GUIDE RODS (1) securely held in the TOP BOOM. Tighten all TOP BOOM connections. (NOTE: Make sure the LAT
CABLE runs over the top of the bolts in the TOP BOOM.)
1/2
0
1
1/2
1
2
TOP BOOM
1/2
1/2
3
12
TIGHTEN! (NOTE: Make sure
LAT CABLE runs over top of
bolts in TOP BOOM.)
TIGHTEN!
1/2
4
5
1/2
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 445104

Table of Contents