ParaBody 445104 Assembly Instructions Manual page 13

Second stack option
Table of Contents

Advertisement

STEP 17
• Screw one of the threaded ends of the previously
removed HEAD PLATE CABLE approximately 1"
into the end of the WEIGHT STACK SHAFT. See
FIGURE 17.
STEP 18
• Route the thread end of HEAD PLATE CABLE up
and over the PULLEYS in the TOP BOOM above
the WEIGHT STACK. (Remove pulleys for ease
of installation.)
• Screw the other threaded end of the HEAD PLATE
CABLE approximately 1" into the end of the shaft
on the D-RING. See FIGURE 18.
• SECURELY tighten the pulleys connection from the previous step.
• Adjust out any slack in the two cable systems. (Refer to your 425104 instructions for the proper procedures.)
FIGURE 18
FIGURE 17
HEAD PLATE CABLE
(67250)
D-RING
HEAD PLATE
CABLE
(67250)
WEIGHT STACK
SHAFT
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 445104

Table of Contents