Download Print this page

Mitsubishi Electric plfy-p vcm-e3 Installation Manual page 3

Air conditioner for building application (indoor unit)

Advertisement

 ,QVWDOOLQJ WKH LQGRRU XQLW
)LJ 
A

)LJ 
1
D
Ceiling
E
Rafter
F
Beam
G
Roof beam
*B: Suspension bolt pitch (see Fig. 2-2
)LJ 
C
25

A
Unit
B
Grille
C
Pillow
2
H
8VH LQVHUWV UDWHG DW  NJ
each (procure locally)
I
6XVSHQVLRQ EROWV 0 ´ SURFXUH
locally)
J
Steel reinforcing rod
B
for details)
 &HLOLQJ RSHQLQJV DQG VXVSHQVLRQ EROW LQVWDOODWLRQ
(mm)
ORFDWLRQV )LJ 
‡ 8VLQJ WKH LQVWDOODWLRQ WHPSODWH WRS RI WKH SDFNDJH DQG WKH JDXJH VXSSOLHG DV DQ
accessory with the grille), make an opening in the ceiling so that the main unit can
be installed as shown in the diagram. (The method for using the template and the
gauge are shown.)
* Before using, check the dimensions of template and gauge, because they
change due to fluctuations of temperature and humidity.
* The dimensions of ceiling opening can be regulated within the range shown in
following diagram; so center the main unit against the opening of ceiling, en-
suring that the respective opposite sides on all sides of the clearance between
them becomes identical.
‡ 8VH 0 ´ VXVSHQVLRQ EROWV
* Suspension bolts are to be procured at the field.
‡ ,QVWDOO VHFXUHO\ HQVXULQJ WKDW WKHUH LV QR FOHDUDQFH EHWZHHQ WKH FHLOLQJ SDQHO
JULOOH DQG EHWZHHQ WKH PDLQ XQLW
A
Outer side of main unit
B
Bolt pitch
C
Ceiling opening
D
Outer side of Grille
E
Grille
F
Ceiling
1RWH WKDW WKH VSDFH EHWZHHQ FHLOLQJ SDQHO RI WKH XQLW DQG FHLOLQJ VODE DQG HWF PXVW EH 
to 15 mm to be left.
* Leave the maintenance space at the electric component box end.
 ,QVWDOODWLRQ RI GXFW LQ FDVH RI IUHVK DLU LQWDNH
(mm)
)LJ 
&DXWLRQ
/LQNDJH RI GXFW IDQ DQG DLU FRQGLWLRQHU
OQ FDVH WKDW D GXFW IDQ LV XVHG EH VXUH WR PDNH LW OLQNHG ZLWK WKH DLU FRQGLWLRQHU
when outside air is taken.
'R QRW UXQ WKH GXFW IDQ RQO\ ,W FDQ FDXVH GHZ GURS
0DNLQJ D GXFW IODQJH SUHSDUHG ORFDOO\
‡ 7KH VKDSH RI GXFW IODQJH VKRZQ OHIW LV UHFRPPHQGHG
,QVWDOODWLRQ RI GXFW IODQJH
‡ &XW RXW WKH FXWRXW KROH 'R QRW NQRFN LW RXW
‡ ,QVWDOO D GXFW IODQJH WR WKH FXWRXW KROH RI WKH LQGRRU XQLW ZLWK WKUHH  u  WDSSLQJ
screws which should be prepared locally.
,QVWDOODWLRQ RI GXFW VKRXOG EH SUHSDUHG ORFDOO\
‡ 3UHSDUH D GXFW RI ZKLFK LQQHU GLDPHWHU ILWV LQWR WKH RXWHU GLDPHWHU RI WKH GXFW IODQJH
‡ ,Q FDVH WKDW WKH HQYLURQPHQW DERYH WKH FHLOLQJ LV KLJK WHPSHUDWXUH DQG KLJK KXPLGLW\
wrap the duct in a heat insulate to avoid causing dew drop on the wall.
A
Duct flange recommended shape
7KLFNQHVV  RU PRUH
B
3-ø5 hole
C
Detail drawing of fresh air intake
D
Indoor unit
E
Ceiling surface
 6XVSHQVLRQ VWUXFWXUH *LYH VLWH RI VXVSHQVLRQ
VWURQJ VWUXFWXUH )LJ 
‡ 7KH FHLOLQJ ZRUN GLIIHUV DFFRUGLQJ WR WKH FRQVWUXFWLRQ RI WKH EXLOGLQJ %XLOGLQJ FRQ-
structors and interior decorators should be consulted for details.
(1) Extent of ceiling removal: The ceiling must be kept completely horizontal and the
ceiling foundation (framework: wooden slats and slat holders) must be reinforced
in order to protect the ceiling from vibration.
(2) Cut and remove the ceiling foundation.
(3) Reinforce the ends of the ceiling foundation where it has been cut and add ceiling
foundation for securing the ends of the ceiling board.
(4) When installing the unit on a slanting ceiling, interlock a pillow between the ceiling
and the grille and set so that the unit is installed horizontally.
1
Wooden structures
‡ 8VH WLH EHDPV VLQJOH VWRULHG KRXVHV RU VHFRQG IORRU EHDPV WZR VWRU\ KRXVHV
as reinforcing members.
‡ :RRGHQ EHDPV IRU VXVSHQGLQJ DLU FRQGLWLRQHUV PXVW EH VWXUG\ DQG WKHLU VLGHV PXVW
EH DW OHDVW  FP ORQJ LI WKH EHDPV DUH VHSDUDWHG E\ QRW PRUH WKDQ  FP DQG WKHLU
VLGHV PXVW EH DW OHDVW  FP ORQJ LI WKH EHDPV DUH VHSDUDWHG E\ DV PXFK DV 
FP 7KH VL]H RI WKH VXVSHQVLRQ EROWV VKRXOG EH ¡ ´  7KH EROWV GR QRW FRPH
with the unit.)
2
Ferro-concrete structures
Secure the suspension bolts using the method shown, or use steel or wooden hang-
ers, etc. to install the suspension bolts.
JULOOH
G
0LQ  PP (QWLUH SHULSKHU\
If setting the maintenance space for
VXUH WR OHDYH LV D PLQLPXP RI  PP
H
Maintenance space
I
Fresh air intake
J
Angle
K
Electric component box
F
¡ %XUULQJ KROH
G
ø73.4 cutout hole
H
Duct flange (Prepared locally)
I
4 u  7DSSLQJ VFUHZ 3UHSDUHG ORFDOO\
J
Duct
G
, be


Advertisement

loading