First Steps; Assembly - BRAND seripettor FEP Operating Manual

Bottle dispencer
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
Is everything in the package? Confirm that your package includes:
seripettor
:
®
Pump assembly seripettor
cartridge, 3x bottle adapters (PP) and this operating manual.
seripettor
pro:
®
Pump assemblx seripettor
2x dispensing cartridge, 3x bottle adapters (PP), mounting tool and this operating manual.
Adapters for bottle thread
seripettor
®
GL 32-33, GL 38, S 40
seripettor
pro
®
GL 32-33, GL 38, S 40

Assembly

Warning:
Wear protective clothing, eye protection and gloves! Follow all safety
instructions and observe limitations of use and operating limitations
(pages 28-30).
1.
Unscrew dispens-
ing cartridge
2.
Mount pump
assembly
, valve block with discharge tube (pre-assembled), filling tube, 2x dispensing
®
pro, valve block with discharge tube (pre-assembled), telescoping filling tube,
®
Screw dispensing cartridge into valve
block (Fig.1).
a) Open piston lock on the pump as-
sembly (Fig. 2a).
b) Put pump assembly over the dispens-
ing cartridge and screw it down to the
valve block (Fig. 2b).
c) Depress pump assembly up to the
lower stop and keep holding it using
one hand and with the other hand,
close piston locking on the pump as-
sembly (Fig. 2c).
d) Release pump assembly and check
to see whether the piston in the dis-
pensing cartridge has moved upward.
Note:
Check the discharge tube for a tight fit.
After two days tighten up the locking
nut(s).
Filling tube length
250 mm
125 - 240 mm

First Steps

1
2a
2b
2c
33

Advertisement

Table of Contents
loading

Table of Contents