gastelgarden xk 140 hd User Manual page 55

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 47
5.12 LUBRICATION
All lubrication points in accordance with the table
below must be lubricated every 50 hours of opera-
tion as well as after every wash.
Object
Action
Centre point 4 grease nipples.
Use a grease gun filled with
universal grease. Pump until
the grease emerges.
Steering
Brush the chains clean with a
chains
wire brush.
Lubricate with universal
chain spray.
Tensioning
Lubricate the bearing points
arms
with an oil can when each
control is activated.
Ideally carried out by two
people.
Control
Lubricate the cable ends with
cables
an oil can when each control
is activated.
Must be carried out by two
people.
5.13 FUSE
In the event of electrical faults, check/replace the
fuse, 20 A. See 9:S.
6 PATENT - DESIGN REGISTRA-
TION
This machine or parts thereof is covered by the fol-
lowing patent and design registration:
SE9901091-0, SE9901730-3, SE9401745-6,
US595 7497, FR772384, DE69520215.4,
GB772384, SE0301072-5, SE04/000239 (PCT),
SE0401554-1, SE0501599-5.
ENGLISH
Fig-
ure
17
-
18
18
GGP reserves the right to make alterations to the
product without prior notification.
EN
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xk 160 hdXk4 160 hd

Table of Contents