Pump Installation; Pump Orientation; Rotation Of Pump Head; Plumbing Pump Head - Whale SDP073R Installation Instructions Manual

Model number sdp073r dry deck 20
Table of Contents

Advertisement

4

Pump Installation

Before mounting the pump refer to the
1.1
plumbing diagram opposite for maximum
pipe runs.
Mount the pump on a solid wall to prevent
vibration. Use a back board if this is not
possible.
The pump is mounted vertically (see
opposite) within 3 m of the gulley.
To aid servicing the head of the pump must
be above the floor by at least 150 mm
(maximum height of 500 mm).
Fix the pump in position through the feet with
the screws and washers provided.
Rotate the pump head if necessary to give a
1.2
straight run of pipe to the waste. Loosen the
clamping ring on the pump head and rotate
the head before retightening clamping ring.
Note: Do not remove the pump head.
Plumbing
Push fit fittings are provided to connect the
1.3
pump to inlet and discharge pipework.
All pipework in and out of the pump must be
in 22 mm.
Ensure fittings are locked after the pipe has
been pushed home.
1.1
1.2
1.3

Advertisement

Table of Contents
loading

Table of Contents