Growatt 10000HY Installation & Operation Manual

Growatt 10000HY Installation & Operation Manual

Grid inverter

Advertisement

GROWATT NEW ENERGY TECHNOLOGY Co.,LTD
No.28 Guangming Road, Shiyan, Baoan District,
Shenzhen, P.R. China
T
+ 86 755 2747 1900
F
+ 86 755 2747 2131
E
info@ginverter.com
W
www.ginverter.com
GR-UM-A03-A-00
Growatt 10000HY
Installation
&
Operation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 10000HY and is the answer not in the manual?

Questions and answers

Summary of Contents for Growatt 10000HY

  • Page 1 Growatt 10000HY Installation & Operation Manual GROWATT NEW ENERGY TECHNOLOGY Co.,LTD No.28 Guangming Road, Shiyan, Baoan District, Shenzhen, P.R. China + 86 755 2747 1900 + 86 755 2747 2131 info@ginverter.com www.ginverter.com GR-UM-A03-A-00...
  • Page 2: Table Of Contents

    Contents Introduction Dry Contact Signal 10.1 Electric Parameter Important Safety 10.2 Function Description Warning Relay Control Port Unpacking & Overview 11.1 Interface Configuration 11.2 Function Description 3 1 Packing List 11.3Application 3 2 Product Overview Installation Application with Energy Meter 4.1 Selecting Mounting Location Commissioning 4.2 Mounting Unit...
  • Page 3: Introduction

    Introduction Important Safety Warning Before using the inverter, please read all instructions and cautionary markings on the This hybrid PV inverter can provide power to connected loads by utilizing PV power, unit and this manual. Store the manual where it can be accessed easily. utility power and battery power.
  • Page 4 Symbols used in Equipment Markings CAUTION! Do not disassemble this inverter yourself. It contains no user-serviceable parts. Attempt to service this inverter yourself may cause a risk of electrical shock or fire and will void the Refer to the operating instructions warranty from the manufacturer.
  • Page 5: Unpacking & Overview

    Unpacking & Overview 3.1 Packing List Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: Fixing screws Software CD Inverter unit PV connectors Manual USB cable Mounting plate AC connector...
  • Page 6: 2 Product Overview

    Installation 3.2 Product Overview 4.1 Selecting Mounting Location Consider the following points before selecting where to install: · Do not mount the inverter on flammable construction materials. Mount on a solid surface · This inverter can make noises during operation which may be perceived as a ·...
  • Page 7 4. Check if the inverter is firmly secured. 1. Drill six holes in the marked locations with supplied six screws. The reference tightening torque is 35 N.m. Figure 4.1 Figure 4.4 2. Raise the inverter and place it over the mounting plate. Figure 4.2 3.
  • Page 8: Connecting To The Ac Utility

    Grid (Utility) Connection Step 1: Check the grid voltage and frequency with an AC voltmeter. It should be the same to “VAC” value on the product label. 5.1 Preparation Step 2: Turn off the circuit breaker. Step 3: Remove insulation sleeve 13 mm for five conductors. NOTE: The overvoltage category of the AC input is III.
  • Page 9 PV Module (DC) Connection Step 7: Plug the AC connection socket into AC grid terminal of the inverter. CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules. NOTE1: Please use 1000VDC/20A circuit breaker. NOTE2: The overvoltage category of the PV input is II.
  • Page 10 Step 2: Disconnect the circuit breaker and switch off the DC switch. Step 3: Assemble provided PV connectors with PV modules by the following below steps. Figure 6.4 Insert assembled cable into male connector housing as shown below charts. Components for PV connectors and Tools: Female connector housing Female terminal Figure 6.5...
  • Page 11 Battery Connection Conductor cross-section (mm2) AWG no. CAUTION: Before connecting to batteries, please install separately a DC circuit breaker between inverter and batteries. Table 6.2 NOTE1: Please only use sealed lead acid battery, vented and Gel battery. Please check maximum charging voltage and current when first using this inverter. If using Lithium iron or Nicd battery, please consult with installer for the details.
  • Page 12: Connecting To The Ac Output

    Load (AC Output) Connection Step 4: Make sure the wires are securely connected. The reference tightening torque is 2.04 N.m. 8.1 Preparation WARNING! It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable size as below.
  • Page 13: Communication

    Communication Step 3: Thread five cables through socket element (E) according to polarities indicated on it and tighten the screws to fix wires after The inverter is equipped with several communication ports and it is also equipped connection. with a slot for alternative communication interfaces in order to communicate with a PC with corresponding software.
  • Page 14: Electric Parameter

    Dry Contact Signal You can set the related parameters in software. Refer to below chart: There is one dry contact available on the bottom panel. It could be used to remote control for external generator. 10.1 Electric Parameter Parameter Max. Unit Symbol Relay DC voltage...
  • Page 15: Interface Configuration

    Relay Control Port Output voltage from relay Unit status Condition control port This port is available to provide a power source (230V/8A) to trigger external relay. Condition 3: This function is only valid for Grid-tie with backup II mode. Power On 230V 11.1 Interface Configuration There are four pins on this port.
  • Page 16 Application with Energy Meter Commissioning Step 1: Check the following requirements before commissioning: With Modbus card II and energy meter, hybrid inverter can be easily integrated into the existing household system. For details please refer to Modbus card II manual. Ensure the inverter is firmly secured ·...
  • Page 17: Initial Setup

    Initial Setup Grid-Tie: PV power only can feed-in back to grid. · Off-Grid: PV power only provides power to the load and charge battery. No feed- · in back to grid is allowed. Before inverter operation, it’s required to set up “Operation Mode” via software. Please strictly follow below steps to set up.
  • Page 18 PV energy supply priority setting: 1st Battery, 2nd Load and 3rd Grid. Allow to charge battery: This option is automatically determined by setting in “Charging source”. It’s not allowed to modify here. When “NONE” is selected in PV power will charge battery first, then provide power to the load. If there is any charging source section, this option becomes unchecked as grey text.
  • Page 19: Charging

    ·Grid-tie with backup (II) : When PV power is not available: 1. 1st Grid, 2nd Battery: Grid will provide power to the load at first. If grid is not available, battery power will provide power backup. 2. 1st Battery, 2nd Grid: Battery power will provide power to the load at first. If battery power is running out, grid will back up the load NOTE: This option will become ineffective during AC charging time and the priority will automatically become 1st Grid and 2nd Battery order.
  • Page 20: Charging

    Load supply source: Working logic under peak time: When PV power is available: PV energy supply priority: 1st Load, 2nd Battery and 3rd Grid 1. 1st PV, 2nd Battery, 3rd Grid PV power will provide power to the load first. If PV power is sufficient, it will charge battery next.
  • Page 21: Charging

    Grid-Tie Battery charging source: Under this operation mode, PV power only feeds-in to the grid. No priority setting is 1. PV or Grid: If there is remaining PV power after supporting the loads, it will charge available. battery first. Only until PV power is not available, grid will charge battery. (Default) 2.
  • Page 22 ·Off-Grid (II) When PV power is not available: 1. 1st Grid, 2nd Battery: Grid will provide power to the load at first. If grid is not available, battery power will provide power backup. 2. 1st Battery, 2nd Grid: Battery power will provide power to the load at first. If battery power is running out, grid will back up the load.
  • Page 23: Interface

    Operation 3. None: It is not allowed to charge battery no matter it’s PV power or grid. NOTE: It’s allowed to set up AC charging duration. 15.1 Interface This display is operated by four buttons. Load supply source: When PV power is available: 1st PV, 2nd Battery, 3rd Grid PV power will provide power to the load first.
  • Page 24 Function Function Display Display Indicates utility. Indicates AC input voltage or frequency. Vac: voltage, Hz: frequency, L1N/L2N/L3N: Line phase Icon flashing indicates utility voltage or frequency is out of range. Indicates AC output power, voltage, frequency, or load percentage. KVA: apparent power, KW: active power, Indicates battery condition.
  • Page 25: Query Menu Operation

    Setting Display Procedure Operation Button Function ·Input voltage or frequency of AC input Short press. Enter query menu. If it’s in query menu, press this button Procedure to confirm selection or entry. ENTER/ON Press and hold the button for This inverter is able to provide power approximately 1 second when to connected loads via AC output connector.
  • Page 26: Operation Mode & Display

    15.5 Operation Mode & Display ·Battery voltage or percentage. Procedure Below is only contained LCD display for grid-tie with backup mode (I) . If you need to know other operation mode with LCD display, please check with installer. Inverter mode with grid connected This inverter is connected to grid and working with DC/INV operation.
  • Page 27 Inverter mode without grid connected LCD Display Description This inverter is working with DC/INV operation and not connecting to the grid. LCD Display Description This inverter is disabled to generate power to the loads via AC output. PV p o w e r a n d u t i l i t y a re c h a r g i n g PV power is sufficient to charge battery at the same time because of battery and provide power to the...
  • Page 28: Charging Management

    Charging Management Standby mode : This inverter is working with DC/INV operation and not connecting to the grid. LCD Display Description Note Charging Parameter Default Value Charging current It can be adjusted via software This inverter is disabled on AC output from 10Amp to 200Amp.
  • Page 29 Maintenance & Cleaning Below is setting screen from software: Check the following points to ensure proper operation of whole solar system at regular intervals. · Ensure all connectors of this inverter are cleaned all the time. Before cleaning the solar panels, be sure to turn off PV DC breakers. ·...
  • Page 30: Warning List

    Trouble Shooting Description Icon(flashing) Code Warning Event Battery under-voltage Battery discharges to When there is no information displayed in the LCD, please check if PV when grid is loss shutdown point. module/battery/grid connection is correctly connected. Battery open Battery is unconnected or too low.
  • Page 31: Specifications

    Specifications Situation Fault Fault Event Possible cause Situation Code MODEL Growatt10000HY Solar over current Surge 1. Restart the inverter. 2. If the error message still remains, please contact your installer. RATED POWER 10000 W GFCI fault Leakage current PV INPUT (DC) excceds the limit.
  • Page 32 BATTERY MODE OUTPUT (AC) Nominal Output Voltage 230 VAC (P-N) / 400 VAC (P-P) Output Frequency 50 Hz / 60 Hz (auto sensing) Output Waveform Pure sine wave Output Power 10000VA/10000W Efficiency (DC to AC) BATTERY & CHARGER (Lead-acid/Li-ion) DC Voltage Range 40 –...