CAIRplus
5.2.3 Additional measures for units for outdoor installation
5.2.4 Preparing roof installation
1
1
1
Fig. 5-25:
Preparing roof installation
PR-2009-0096-GB • Subject to modifications • R8-10/2015
Risk of damage to the unit!
Insufficient or improper sealing by others on site can cause water leakage and
damage to the equipment and building materials!
Carefully seal all unit components.
When installing roof components ensure that no loads are applied on the roof
panels. Do not walk on the floor panels.
If necessary use a proper pad for the entire roof surface.
During assembly and assembly pauses, take care that no rainwater gets into the
units.
After assembly is completed, you must remove the protective foil from the roof
panels.
2
ATTENTION
Remove all lifting lugs (1).
Install sealing washers at all screws and tighten them (2).
Assembly
33