CAME S.p.A. is not liable for any damage caused by conditions have been restored • Cut off the power supply before releasing improper, wrongful and unreasonable use •...
This symbol tells you what to say to the end-users. 2 Intended use and restrictions 2.1 Intended use The ATI F500 - F510 gearmotor is specifi cally engineered to automate residential and condominium swing gates, even under intensive use. 2.2 Restrictions...
• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts; • Make sure there is a mechanical stop for opening and closing. B= 350 mm F500 = 230 mm max with 90° opening angle...
5.2 Tools and materials Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the current standards and regulations. The following figure illustrates the minimum equipment needed by the installer. 5.3 Cable list and minimum thickness Length of cable Length of cable...
1) Trace the centre lines and external dimensions of the entire assembly in accordance with the diagrams on pages 2 and 3. Next, mount the fl ange for the gear motor on the wall or pillar, and mount the anchor block for gear motor F500 on the gate.
Page 8
2a) Use the hardware provided with the unit to join the two halves of the articulated arm together. F500 2b) Secure the runner to the wing and insert the straight arm. F510 3) Remove the cover at the bottom of the gear motor.
Page 9
- make the electrical connection, supply voltage to the ratio-motor during closure and secure the arm with the M6 (B) grub screw; - fi x the lower cap. F500 ø 3,9 x 13 5b) - Assemble the articulated arm (D) onto the intermediate bush which is all in one with the ratiomotor shaft;...
6) Complete instal-lation by mounting the upper cover with its OR gasket. 6 Electrical connections Electric connections to the ZL150N control panel 24 V D.C. gearmotor featuring 24 V D.C. gearmotor featuring delayed action on opening delayed action on closing FLEX FLEX Green...
9.3 Maintenance Periodic maintenance Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator. ☞ Periodic maintenance log kept by users (every six months) Date Notes Signature 9.4 Extraordinary maintenance The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
CAME S.p.A. employs a UNI EN ISO 14001 certified and compliant environmental protection system at its plants, to ensure that environmental safeguarding. We ask you to keep protecting the environment, as CAME deems it to be one of the fundamental points of its market operations strategies, by simply following these brief guidelines when disposing.