Figure 17 Crimping the Ring Terminal
4.
Slide the ground screw through the terminal.
5.
Insert the ground screw into the functional ground screw opening on the front panel.
6.
Use a ratcheting torque screwdriver to tighten the ground screws and ring terminal to the switch front panel to 3.5
in-lb (0.4 N-m). See
Figure 18 on page 40
Note:
Do not exceed 3.5 in-lb (0.4 N-m) of torque.
or
Figure 19 on page
41.
39