Cisco IE 2000 Installation Manual page 39

Hide thumbs Also See for IE 2000:
Table of Contents

Advertisement

Figure 17 Crimping the Ring Terminal
4.
Slide the ground screw through the terminal.
5.
Insert the ground screw into the functional ground screw opening on the front panel.
6.
Use a ratcheting torque screwdriver to tighten the ground screws and ring terminal to the switch front panel to 3.5
in-lb (0.4 N-m). See
Figure 18 on page 40
Note:
Do not exceed 3.5 in-lb (0.4 N-m) of torque.
or
Figure 19 on page
41.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents