Drive Belt And Drum - GE GHDS830EDWS Technical Service Manual

Hide thumbs Also See for GHDS830EDWS:
Table of Contents

Advertisement

Drive Belt and Drum

The drum rotates clockwise, as viewed from the
front, at a speed of 46-50 rpm. The drive belt
extends from the motor pulley, past the idler pulley,
and around the perimeter of the dryer drum.
To remove the drive belt:
1. Remove the control, top, and front panels. (See
Control Panel, Top Panel,
2. Remove the front bulkhead. (See
3. To release belt tension, reach under the left side
of the drum, push the idler pulley to the left,
then lock the idler arm into the top indentation
on the idler arm bracket. (See photo. Drum
removed for clarity.)
Non-Long Vent Model
Idler Pulley
Idler Arm
Long Vent Model
Idler Arm
Idler Pulley
4. Remove the belt from the motor pulley and idler
pulley.
5. Guide the belt out from the dryer cabinet.
and
.)
Front Panel
.)
Front Bulkhead
Idler Arm Bracket
Idler Arm Bracket
– 20 –
To install the drive belt:
1. Place the belt in position around the
circumference of the drum.
2. Reach under the left side of the drum and place
the belt in position around the motor and idler
pulleys.
3. Release the idler pulley and guide the belt into
position.
Note: The belt should be oriented so that the belt
grooves contact the motor pulley.
Non-Long Vent Model Drive Belt Installed
Long Vent Model Drive Belt Installed
(Continued Next Page)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents