5. MECHANICAL ADJUSTMENT

5.
MECHANICAL ADJUSTMENT
5.1

Gate solenoid/Lw adjustment

• Make this adjustment when the gate solenoid/Lw (SD1) is replaced with a new one.
1. Remove the Z folding unit.
See P.14
2. Remove the front cover.
See P.13
3. Pull out the Z folding/conveyance unit.
[1]
[5]
28
[4]
[1]
[2]
[3]
b
a
A07TF3C507DA
Service Manual
Field Service Ver. 1.0 Jul. 2009
4. Loosen two screws [1] and then visu-
ally adjust so that the gate/Lw [2]
maintains the standard value a rela-
tive to the guide plate [3]. Then,
tighten the two screws [1].
Standard value: a = 3 mm to 5 mm
5. Loosen two screws [4] and adjust the
gate /Lw [2] so that the clearance
between the gate /Lw [2] and the
guide plate [3] gets to the standard
value "b" while gate solenoid/Lw
turns ON and the plunger [5] is
pulled, and then tighten two screws
[4].
Standard value: b = 2 mm to 4.6 mm
Y111420-1