Field Service Ver. 1.0 Jul. 2009 1. PRODUCT SPECIFICATIONS OUTLINE PRODUCT SPECIFICATIONS A. Type Type Z-folding multi punching device B. Functions Punch Punching method Reciprocal punching method (punching each paper) No. of holes Metric area : 2 holes/4 holes (switched automatically) Inch area : 2 holes/3 holes (switched automatically) Hole diameter...
Page 6
1. PRODUCT SPECIFICATIONS Field Service Ver. 1.0 Jul. 2009 Z-folding Folding length A07TT1C010AA Paper size L (mm) a (mm) 209 or less 181 or less 4 ± 2 11 x 17 215 or less 8K *1 194 or less *1: Only for the Taiwan market Folding precision 2 mm or less 2 mm or less...
Page 7
Field Service Ver. 1.0 Jul. 2009 1. PRODUCT SPECIFICATIONS Maximum tray capacity (80 g/m The maximum number of sheets for the FS main tray at the Z- folding operation • Z-folding continuous: Max. 30 sheets • Z-folding/stapling: See the table below No.
Page 8
1. PRODUCT SPECIFICATIONS Field Service Ver. 1.0 Jul. 2009 Paper curling 5 sheets of paper immediately after the printing A07TT1C006AA a : Excluding the OHP paper : Amount of curl: 15 mm or less OHP paper : Amount of curl: 10 mm or less D.
Field Service Ver. 1.0 Jul. 2009 2. PERIODICAL MAINTENANCE PROCEDURE MAINTENANCE PERIODICAL MAINTENANCE PROCEDURE Punch section 2.1.1 Replacing the punch scraps conveyance motor (M7) A. Periodical replaced parts/cycle • Punch scraps conveyance motor: Every 1,000,000 counts B. Procedure 1. Remove the Z folding unit. See P.14 2.
2. PERIODICAL MAINTENANCE PROCEDURE Field Service Ver. 1.0 Jul. 2009 2.1.2 Replacing the punch clutch (CL1) A. Periodical replaced parts/cycle • Punch clutch: Every 1,000,000 counts B. Procedure 1. Remove the Z folding unit. See P.14 2. Remove the punch unit. See P.17 3.
Page 11
Field Service Ver. 1.0 Jul. 2009 2. PERIODICAL MAINTENANCE PROCEDURE 5. Remove the C-clip [1], and remove the punch clutch [2]. NOTE • When reinstalling punch clutch [2], be sure to check the stopper [3] is engaged with a projection [4] of metal plate.
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 OTHER MAINTENANCE ITEM Items not allowed to be disassembled and adjusted A. Paint-locked screws NOTE • To prevent loose screws, a screw lock in blue or green series color is applied to the screws.
Page 13
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM E. Parts not allowed to be removed (1) Punch section • The precision of the punch edges is ensured in the punch unit. The normal punch opera- tion may be affected if it is disassembled. Never loosen or remove these screws and retaining rings.
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 Disassembly/reassembly parts list Section Part name Ref. page Rear cover P.11 Upper cover P.12 Exterior parts Right cover P.12 Front cover P.13 Z folding unit P.14 Units Punch unit P.17 Z folding/conveyance unit P.18 Punch motor (M4)
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM Disassembly/reassembly procedure 3.3.1 Rear cover 1. Remove the screw [1] and the clamp [2], and remove the power cord [3]. A109F2C500DA 2. Loosen the screw [1], and remove two screws [2], and remove the rear cover [3].
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.2 Upper cover 1. Remove the Z folding unit. See P.14 2. Remove four screws [1], and remove the upper cover [2]. A07TF2C001DA 3. Reinstall the above parts following the removal steps in reverse. 3.3.3 Right cover 1.
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 3.3.4 Front cover 1. Remove the Z folding unit. See P.14 2. Remove three screws [1], and remove the front cover [2]. A07TF2C003DA 3. Reinstall the above parts following the removal steps in reverse. Y111420-1 Service Manual...
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.5 Z folding unit A. Removal from the finisher 1. Open the front door of finisher [1]. 2. Remove two screws [2] and slide the finisher as shown in the illustration. A109F2C501DA NOTE •...
Page 19
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM B. Removal from the main body 1. Remove the finisher. See P.14 2. Remove the punch waste box [1]. A07TF2C503DA 3. Remove three screws [1] and two washers [2]. A07TF2C504DA 4.
Page 20
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 5. Remove the Z folding unit [1]. CAUTION • Make available collective manpower of an appropriate size for transport- ing the machine. A07TF2C506DA NOTE • When reinstalling the Z folding unit, use the upper/lower brackets [1] as a guide for positioning the Z folding unit.
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 3.3.6 Punch unit 1. Remove the Z folding unit. See P.14 2. Remove the rear cover. See P.11 3. Remove the right cover. See P.12 4. Pull out the Z folding/conveyance unit [1].
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.7 Z folding/conveyance unit 1. Remove the Z folding unit. See P.14 2. Remove the upper cover. See P.12 3. Pull out the Z folding/conveyance unit [1]. A07TF2C007DA 4. Disconnect three connectors [1]and remove two screws [2], and remove the arm [3].
Page 23
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 6. Remove four screws [1], and remove Z-folding/conveyance unit [3] to the front [4] by holding the rails [2] at the both sides. A07TF2C009DA NOTE • When placing the Z-folding/convey- ance unit, place it on the flat sur- face with its top or left side down.
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.8 Punch motor (M4) 1. Remove the Z folding unit. See P.14 2. Remove the punch unit. See P.17 3. Remove two screws [1], and remove the punch motor assy [2]. NOTE •...
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 3.3.9 Main motor (M6) 1. Remove the Z folding unit. See P.14 2. Remove the upper cover. See P.12 3. Remove four screws [1], and remove the conveyance upper cover [2]. A07TF2C014DA 4.
Page 26
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 7. Remove the screw [1], the slit circu- lar disc [2] and the belt [3], and remove the main motor assy [4] A07TF2C017DA 8. Remove four screws [1], and remove the main motor [2].
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 3.3.10 Registration motor (M1) 1. Remove the Z folding unit. See P.14 2. Disconnect the connector [1], and remove three screws [2], and remove the registration motor assy [3]. A07TF2C019DA 3.
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.11 Punch shift motor (M5) 1. Remove the Z folding unit. See P.14 2. Remove the rear cover. See P.11 3. Disconnect two connectors [1] and remove three screws [2], and remove the punch shift motor assy [3].
Field Service Ver. 1.0 Jul. 2009 3. OTHER MAINTENANCE ITEM 3.3.12 Main motor cooling fan (FM1) 1. Remove the Z folding unit. See P.14 2. Remove the rear cover. See P.11 3. Remove the upper cover. See P.12 4. Disconnect the connector [1], and remove four screws [2], and remove the harness from wire saddle [3], and remove the main motor cooling...
3. OTHER MAINTENANCE ITEM Field Service Ver. 1.0 Jul. 2009 3.3.13 ZU control board (ZUCB) 1. Remove the Z folding unit. See P.14 2. Remove the punch unit. See P.17 3. Disconnect all thirteen connectors from the ZU control board. 4.
Field Service Ver. 1.0 Jul. 2009 4. HOW TO USE THE ADJUSTMENT SECTION ADJUSTMENT/SETTING HOW TO USE THE ADJUSTMENT SECTION • “Adjustment/Setting” contains detailed information on the adjustment items and proce- dures for this machine. • Throughout this “Adjustment/Setting,” the default settings are indicated by “ ”. Advance checks Before attempting to solve the customer problem, the following advance checks must be made.
5. MECHANICAL ADJUSTMENT Field Service Ver. 1.0 Jul. 2009 MECHANICAL ADJUSTMENT Gate solenoid/Lw adjustment • Make this adjustment when the gate solenoid/Lw (SD1) is replaced with a new one. 1. Remove the Z folding unit. See P.14 2. Remove the front cover. See P.13 3.
Field Service Ver. 1.0 Jul. 2009 5. MECHANICAL ADJUSTMENT 1st folding skew adjustment • Conduct the 1st folding skew adjustment when the skew of the 1st folding is not within the standard value. NOTE • This adjustment affects the 1st Z-fold position. Be sure therefore to perform [1st Z- fold Position] of the service mode whenever this adjustment has been completed.
Page 34
5. MECHANICAL ADJUSTMENT Field Service Ver. 1.0 Jul. 2009 5. Loosen four screws [1]. 6. Adjust the 1st stopper assembly [2] by moving the front side of the assembly to right and left by referring to the markings [3], and then tighten the four screws [1].
Field Service Ver. 1.0 Jul. 2009 5. MECHANICAL ADJUSTMENT 2nd folding skew adjustment • Conduct the 2nd folding skew adjustment when the skew of the 2nd folding is not within the standard value. NOTE • This adjustment affects the 2nd Z-fold position. Be sure therefore to perform [2nd Z-fold Position] of the service mode whenever this adjustment has been com- pleted.
5. MECHANICAL ADJUSTMENT Field Service Ver. 1.0 Jul. 2009 2nd stopper position adjustment • Conduct this adjustment when the 2nd folding position cannot be adjusted from the ser- vice mode or the skew of the 2nd folding cannot be adjusted by the procedure in “6.3 2nd folding skew adjustment.”...
Page 37
Field Service Ver. 1.0 Jul. 2009 5. MECHANICAL ADJUSTMENT 6. Rotate the shaft [2] so that you can reach to two screws [1] with the hex wrench. 7. Loosen two screws [1]. 8. Rotate the shaft [2] so that the actua- tor [3] is roughly positioned to the home position [5] of the 2nd stopper home sensor [4].
Page 38
5. MECHANICAL ADJUSTMENT Field Service Ver. 1.0 Jul. 2009 Blank Page Service Manual Y111420-1...
Page 39
UPDATING STATUS DATE UPDATED PAGES PAGES CODE 10/2009 EDITION Y111420-1...
Need help?
Do you have a question about the ZU-606 and is the answer not in the manual?
Questions and answers