Toro Power Clear 621 Service Manual page 57

Hide thumbs Also See for Power Clear 621:
Table of Contents

Advertisement

5. Remove the bearing spacer bolt and bearing spacer.
6. Remove bearings and flanges. Replace rotor parts
as required (Fig. 019).
7. Re-install the bearing spacer and bolt. Torque bolt to
20 ft-lbs (27 Nm) (Fig. 020).
Toro Single Stage Snow Service Manual
POWER PROPEL SYSTEM
8. Re-install the rotor assembly into the housing.
Re-install the rotor bearing screws. Torque to
8 ft-lbs (11 Nm) (Fig. 021).
Fig. 019
9. Re-install the drive belt and rotor pulley. Torque the
rotor pulley bolt to 8 ft-lbs (11 Nm) (Fig. 022).
Fig. 020
10. Re-install the belt cover. Torque the bolts to 8 ft-lbs
(11 Nm).
Fig. 021
Fig. 022
4-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power clear 418

Table of Contents