Sevylor KCC360 Owner's Manual page 4

Hide thumbs Also See for KCC360:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
FITTINGS
Bottom chamber
with mini Boston
valve
Main chamber with
Boston valve
Drain plug
Transport
handle
Main chamber with
Boston valve
1/ Removable fin on the underside: see the assembly procedure.
This model comes with a back pack carry bag, a pressure gauge and a repair kit.
ASSEMBLY INSTRUCTIONS / INFLATION
E
N
¾ Do not use a sharp tool!
G
¾ Any use of an air compressor will damage your product and automatically void all warranties.
L
¾ Do not open the zippered closing that provides access to the inflatable inner chambers when the kayak is
inflated.
I
S
For the first inflation and in order to get acquainted with your new product, inflate indoors at room temperature where the
H
PVC will be soft and assembly process made easier. If it was stored at a temperature below 0°C / 32°F, leave it at 20°C /
68°F for 12 hours before unfolding. Inflate it with a Sevylor® inflator or any inflator designed for kayaks, pool floats, air
beds, camping mattresses, and other low pressure inflatables. These types of inflators will have a hose and adapters to fit
the valves on this product.
Choose a smooth and clean surface to unfold your product.
1. Fix the directional fin to the bottom, folding the outer hull. Insert the ends of the fin into each of the holders provided
and tauten the outer hull as much as possible to secure it. This operation is not possible when the kayak has been
inflated. The curve of the fin must be towards the stern of the kayak.
2. Your kayak is equipped with two different types of valves:
a) Boston valve(s) – please see opposite figure: Unscrew the valve cap (1). Screw the
valve insert (2) onto its base (3) and check that the valve cap stays accessible. Insert
the pump hose end piece and inflate it until you will reach the required pressure (see
point
3).
N.B.: A slight air-leak before screwing the valve(s) cap is normal. Only the valve(s)
cap can ensure final AIR TIGHTNESS.
b) Double lock™ valve & Mini double lock™ valve – see drawing on page 2 / a:
Open the valve (A). To begin inflation, open external stopper and pull to extend out (B).
Insert nozzle of inflation device into the extended valve and turn on or begin pumping (C). To close valve: push in
with inflation device until stopper has been depressed, sealing internal stopper (D). Remove device and close
external stopper. Valve should appear depressed into itself.
3. Inflate the kayak in the order of inflation as shown on the capacity plate printed on the kayak (see also figure # 1 –
numbering of the valves). The side chambers (2) must each first be inflated to 50%. Then complete inflation to the
recommended pressure in each chamber.
4. Max. air pressure: The correct pressure for this item is : 0.1 bar/1.5 PSI (= 100 mbar). Do not exceed it. Check
the pressure using the pressure gauge supplied with your kayak. Overpressure: deflate until you reach the
recommended pressure. Drop of pressure: inflate again slightly.
Storage bag in poop
2
1
2
Removable
Handles
1
directional fin
After
inflation
fit
Adjustable bucket seats
with raised seat position
with mini double lock
valves
3
3
Paddle holders (starboard
and port sides)
CAUTION!
all
the
valve(s)
cap
4
Zip fastener for opening the nylon
outer hull and accessing the PVC
chambers (bow, stern, port,
starboard) + fastener for the
bottom chamber (bow, stern)
3
Nylon outer hull
tight
(clockwise).
Decking with
bungees and
zip fastener
Transport
handle
Directional strakes
moulded on the bottom
Figure 1
(1) Valve cap
(2) Valve
insert
(3) Valve
base

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents