Data ( L ); Pdi ( ✖ ); Safety - Earth/Ground - Globalstar FAU200 SAT Installation Handbook

Table of Contents

Advertisement

FAU Installation Handbook
4. Replace the insert and then tighten the castellated locking ring and cable clamp.
5. Plug into the FAU and tighten the retaining ring.
The power source should provide +48 volts DC with respect to the FAU case. The
power cable should be supported at regular intervals along its route according to local
regulations. Waterproof sealant should be used to seal and weatherproof the point of
entry of the cable into the building following local installation standards.
L
Data (
)
The data connector is not used in this version of the FAU. Ensure the dust cap is
securely fitted to protect the FAU from dust and moisture ingress.
PDI ( ✖ )
The PDI cable enters a socket at the base of the FAU. When the socket is not in use,
ensure that the dust cap is securely fitted to protect the FAU from dust and moisture
ingress.
NOTE: There is no supplementary surge protection on the PDI port in addition to that
normally provided on an RS232 port.

SAFETY - Earth/Ground

The FAU enclosure must be connected to a single protective earth. A separate copper
earth cable must be installed from the FAU to an earth / ground, in accordance with
local regulations.
Ensure the earthing conductor is attached to the housing as shown above using
toothed washer to provide good contact.
14
Power Socket Connections
DANGER:
EARTH LEAKAGE CURRENTS
Under no circumstances shall the
FAU be operated without a protective
copper earthing conductor.
EARTHING CABLE
WITH RING TAG
(NOT SUPPLIED)
Earthing Connection
EXTERNAL
TOOTHED
WASHER
M6 EARTHING BOLT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents