Toshiba 2000 User Manual page 34

Integrated controller
Hide thumbs Also See for 2000:
Table of Contents

Advertisement

Chapter4 Operation and Function
4
18
Set the PF612.
2
• Turn off MD4, 5, 6, and 7 of MODE2 setup switch.
(When there is an error, hold transmission data and set both transmit and receive)
• Set MODE1 setup switch to 6. (32 word transmission)
Install each module and connect cables.
3
• Install each module on the base unit.
• Connect PF611 and PF612 with transmission cable.
(Turn on both terminating resistors with connector or module.)
• Connect the PC and PF611 with connection cable.
Set PF611 with the configurator (SyCon).
4
• Insert master (PF611) (select HMS Profibus-DP Master.)
• Insert slave (PF612) (select HMS AnyBus-S.)
• Set the slave transmission word count.
(Select 32 word transmission (IN/OUT: 64 bytes (32 words).)
• Set transmission speed with bus parameter.
• Download settings to PF611.
Set each station with PROSEC T-Series engineering tool (T-PDS).
5
• Set PF611 from the master side station.
• Set PF612 from the slave side station.
• Create S2T/S2E controller program and download it.
Run each controller.
6
• When transmission starts, check the status of the PF611 and PF612 LEDs.
Transmission is normal if they are as follows:
PF611...RDY, RUN, TOKEN, ACC on, ERR off
PF612...ONL, ACC on, OFL, DIAG off
Check the transmission data with each controller.
7
• Check that expected data is transmitted on the master and slave side.
Figure 4-4 Startup procedure example
See section 2.4, 2.5
model 2000 PROFIBUS Module User's Manual for S2T/S2E
See section 2.5
See section 9.2
See chapter 5
See chapter 6

Advertisement

Table of Contents
loading

Table of Contents