Completing The Setup - Toro timecutter series Setup Instructions

Table of Contents

Advertisement

Step
5

Completing the Setup

Parts needed for this step:
1
Ignition Key
1
Operator's Manual
1
Engine Operator's Manual
1
Hose coupling
1
Operator Training Material
Procedure
Checking the Tire Pressure
Check the front and rear tires for proper inflation.
Refer to Checking the Tire Pressure in the Operator's
Manual for the recommended inflation pressure.
Checking the Mower Adjustment
The mower deck was leveled at the factory. If the
mower is not cutting level, adjust the side-to-side
level and the front-to-rear blade slope. See the
Operator's Manual for the proper procedure.
Checking the Side Discharge Chute
Remove the packing restraint holding the side
discharge chute up and lower the chute into place.
Checking the Engine Oil Level
Before you start the engine and use the machine,
check the oil level in the engine crankcase; refer to
Checking the Oil Level in the Operator's Manual.
Review the Remaining Parts
Keep all the following items with the machine:
• Ignition Key
• Operator's Manual
• Engine Operator's Manual
• Hose coupling
• View the Operator training material.
5

Advertisement

Table of Contents
loading

Table of Contents