Installing The Control Box - Toro 41229 Operator's Manual

Spray system heavy duty workman vehicles
Hide thumbs Also See for 41229:
Table of Contents

Advertisement

Installing the Control Box

The control box is mounted on the tank skid by a clevis
pin, hair pin and hand knob. It is located on the left side
toward the back.
1. Remove the clevis pin, and hair pin securing the
control box to the tank skid.
2. Install the control box, with the controls facing the
driver, to the control mount using the clevis pin and
hair pin removed previously.
3. Install the hand knob to stabilize the control box.
Tighten by hand.
4. Connect the tank skid wiring harness to the spray
system power connector.
Installing the J-Clips
5. Install two J–clips in the center console at the points
located in figure 21 using the existing screws.
3
1
2
4
Figure 21
1. J-clip
2. Existing screws
6. Install a J-clip in the ROPS cover behind the operator
using a bolt (1/4 x 1 inch) and a nut (1/4 inch). The
hole is on the centerline, approximately 20 inches in
from the operator's side edge of the ROPS cover.
2
m–7184
3. Control box harness
4. Center console
19
Note: If a hole is not present, one must be drilled. Drill a
1/4 inch hole in the top surface of the cover on the
centerline approximately 20 inches from the edge on the
operator 's side (Fig. 22).
1
20 inches
Figure 22
1. Drill hole, 1/4 inch
7. Secure the control box harness to the console and
ROPS cover using the J-clips.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents