1. Boom hinge spring
4. Repeat the procedure for each spring on both boom
hinges.
5. Move the booms into the transport "X" position.
See Operating the Booms in the Operation section
for more information.
Figure 3
2. Jam nut
2
Learning more about your
product.
Parts needed for this procedure:
2
Ignition key
1
Operator's Manual
1
Engine Operator's Manual
1
Parts Catalog
1
Operator Training Material
1
Registration Card
1
Pre-delivery Inspection Sheet
Procedure
1. Read the manuals.
2. View the Operator training material.
3. Complete the registration card and return to Toro.
4. Store the documentation in a safe place.
13