Detroit Diesel Series 60 EGR Technician Manual page 163

Table of Contents

Advertisement

SERIES 60 EGR TECHNICIAN'S MANUAL
TEST G
The air supply line which connects to the VPOD must be a dedicated air supply line. To ensure
that the air supply line is a dedicated air supply line, please read Freightliner Service Information
Bulletin 01–81 (see Figure 10-6, see Figure 10-7, and see Figure 10-8).
Figure 10-6
Freightliner Service Bulletin 01–81 (Page One of Three)
10-23
All information subject to change without notice. (Rev. June 2005)
7SE60 0506 Copyright © 2005 DETROIT DIESEL CORPORATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents