Sub-Zero BI-36R Design Manual page 29

Hide thumbs Also See for BI-36R:
Table of Contents

Advertisement

BUILT-I N RE FR IG E R AT ION
Dual Installation
If two units are installed side by side, a dual installation kit
may be required. Installations without a custom filler strip
require a dual installation kit. If a dual installation kit is not
specified, a 2"
filler strip is recommended between units.
(51)
A custom filler strip is required when installing two French
door or side-by-side models. Dual installations without a
filler strip can only be accomplished using two units with
opposite hinges. Refer to the illustrations below.
Dual installation kits are available through an authorized
Sub-Zero dealer. For local dealer information, visit the find a
showroom section of our website, subzero.com. For ques-
tions regarding the installation, call Sub-Zero customer care
at 800-222-7820.
WITHOUT FILLER STRIP
Opposite hinges.
FILLER STRIP
Same side hinges.
For dual standard installations, panel dimensions are the
same as for single installations. Refer to the charts on pages
22–25. Panel dimensions and offsets for dual flush inset
installations are listed on the following pages.
|
subzero.com/specs
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents