Installation Of Remote Control Switch; Earthing Work - Mitsubishi SRK18CL Technical Manual & Parts List

Table of Contents

Advertisement

Installation of remote control switch

Mounting method of battery
Open the battery cover and insert batteries. [R03(AAA,
Micro) ×2 pieces]
(Make sure that the polarity matches correctly with the
indication marks
)
&
Battery
Cover

Earthing work

Earth work shall be carried out without fail in order to prevent electric shock and noise generation.
The connection of the earth cable to the following substances causes dangerous failures, therefore it shall never be done.
City water pipe, Town gas pipe, TV antenna, lightning conductor, telephone line, etc.
Trial run and operation
Conduct trial run after confirming that there is no gas leaks.
When conducting trial run set the remote control thermostat to continuous operation position. However when the power source
is cut off or when the unit's operation switch is turned off or was turned to fan operation position, the unit will not go int o
operation in order to protect the compressor.
Explain to the customer on the correct usage of the air-conditioner in simple layman's terms.
Make sure that drain flows properly.
Installations test check points
Check the following points again after completion of the installation, and before turning on the power. Conduct a test run again and
ensure that the unit operates properly.
At the same time, explain to the customer how to use the unit and how to take care of the unit by following the instruction manual.
After installation
The power supply voltage is correct as the rating.
No gas leaks from the joints of the operation valve.
Operation valve is fully open.
The pipe joints for indoor and outdoor pipes have
been insulated.
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for approximately 3 min utes.
This is to protect the unit and it is not a malfunction.
CAUTION
Do not use new and
old batteries together.
0
-
– 32 –
Fixing to pillar or wall
Conventionally, operate the wireless remote control
by holding in your hand.
Avoid installing it on a clay wall etc.
Wireless remote control
Test run
Air conditioning operation is normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
The remote control is normal.
Operation of the unit has been explained to the customer.
-
'12 • SRK-T-125
Wood screw
3.5×16
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk18cl-3Srk18cl-6

Table of Contents