1.2 Basic System Construction
1.2
Basic System Construction
1.2.1
Main Unit
The main unit is equipped with 4 Super Hybrid Ports. For system expansion, optional service cards can be
installed, and an additional AC adaptor can also be connected.
Construction of Main Unit
Front Cover
20
Installation Manual
Main Board
Cable Cover