15.7 How to Unlock Cool Mode
1.
Press buttons SET and SERVICE for 5 seconds.
2.
Press SELECT button.
3.
Unlock COOL mode with ▲/▼.
4.
Press SET button.
15.8 Dry Concrete [SERVICE MODE: 03]
If Dry Concrete has been set, Dry Concrete status can be activated and monitored by following procedure.
1
Press SERVICE button for 5 seconds.
2
Press ▲ to enter menu Sr: 03 and press SET buttonto activate Dry Concrete function.
3
Press OFF/ON button to quit setting.
15.9 EEPROM Factory Default Data Setup Procedure
1
This process should be done at Gemstar (and/or) PAPAMY as the last process after any inspection.
2
This condition should be activated by pressing combination of few SW's for certain time as shown.
3
When this condition is activated, default data should be written in EEPROM.
4
Once the default data is written in the EEPROM, the following full LCD display should be ON for 2secs for
confirmation. After 2secs, it goes back to normal display.
These 3 SW's should press continuously for 5secs.
(Operation should be OFF during this period)
OPERATION
102