Preparing For Operation; Operating Tips - Aztec Grand Finale Owner's Manual

Table of Contents

Advertisement

4. Open the Grand Finale body by removing the
two screws in the bucket shelf. Hook up the
battery according to instructions on the base
floor.
5. After performing steps 7 and 8 below, place
solution or finish container on Grand Finale
and insert the suction hose into container.

PREPARING FOR OPERATION

Note: Always pre-sweep or dust mop floor.
Debris in pad can cause streaks.
6. Make sure battery is fully charged. If not,
connect the power cord to the receptacle on
the back of the body. Connect to a power
source and charge battery until "Charged" light
is lit. Remove power cord when battery is fully
charged.
7. Pour about one quart of finish or coating
solution into the Grand Finale bucket and
saturate pad in solution.
8. Wring out pad and lay flat on floor, back side up.
9. Pull back on lift handle to raise head assembly
and pad holder. Lower pad holder onto
saturated pad.
Always check the distribution tube to make
sure all holes are open.
OPERATION
10. Turn control switch to PRIME/CLEAN and
hold in that position until finish/solution
sprays from head assembly. Release to
return switch to OFF position, then move
switch to RUN.
11. Turn flow control to desired setting. Higher
viscosity fluids will require a numerically
higher setting.
12. Pull Grand Finale backwards about 20 feet
and check coverage.
13. Adjust flow control to get coverage desired.

OPERATING TIPS

1. Turn flow control switch to zero, 10 feet
before finishing an area to minimize dripping.
2. If floors are thoroughly stripped or have not
been coated before, walk slow and increase
flow for the first coat. This will eliminate
streaking.
3. Not all finishes are the same. It may be
necessary to try different settings or walking
speeds for optimal results.
4. Walk at a comfortable speed. Do not walk
faster than the applicator can evenly spread
the finish.
5. Turn flow control switch to zero before
making the turn at end of each pass to
prevent over saturation of pad. Turn control
switch back to desired flow setting after
making each turn.
6. Push Grand Finale straight forward toward
corner after making turn.
7. Pull straight back until pad is past wet edge.
8. Swing Grand Finale outside wet edge and
push forward.
9. Continue parallel to first pass overlapping first
pass 4".
10. Continue process until entire floor is covered,
leaving an exit path. Shut off solution supply
10 feet before finish to minimize dripping.
Surface Type
Floor Finish/Sealer on VCT
Concrete/Gym Coating
!
WARNING
Always remember to turn the control switch
to RUN when resuming normal operation.
When applying finish to large areas, the
finish may dry before the next pass is made.
Finish smaller sections at a time so you can
always keep a wet edge to overlay.
GRAND FINALE PG. 3
Flow Setting
1 1/2 - 2 1/2
3-8

Advertisement

Table of Contents
loading

Table of Contents