(1) NORTEC LINKS 2 START-UP CHECKLIST

WIRING
Humidifier-to-Humidifier Connection:
Each individual humidifier linked to lead unit.
Connection must be daisy-chained to other units.
BMS Network Connection:
Lead unit wired to BMS system (Twisted Pair or Ethernet).
Network activity verified.
Controls Wired:
Directly to humidifiers or through BMS network.

(2) START-UP PROCEDURE

(1) Ensure power is being supplied to the humidifier, Nortec Links Module and Nortec
OnLine module. For BACnet/IP adjust network IP settings. (If this information is
provided, factory will perform necessary IP assignment).
(2) After power-up, verify network communication.
(3) Map desired network variables to BMS.
(4) Verify variable operation after mapping is complete.
(5) Perform regular humidifier start-up check.
10-20
Page 2
2008-02-18