Check Lists; Pre-Nortec Online Start Up Checklist Wiring; Pre-Nortec Links Start-Up Checklist - Nortec NH Series Installation Manual

Nh series electrode steam humidifier
Hide thumbs Also See for NH Series:
Table of Contents

Advertisement

2. CHECK LISTS

A. PRE-NORTEC ONLINE START UP CHECKLIST WIRING
(1) Humidifier-to-Humidifier
Connection:
Each individual Humidifier linked
to lead Unit.
Connection can be direct or
daisy-chained to other units.
(2) Network Connection:
Lead Unit wired to Local Network
(Ethernet, GPRS, Dial-up).
Network activity verified.
(3) Controls Wired:
Directly to humidifiers.
B. PRE-NORTEC LINKS START-UP CHECKLIST
(1) Humidifier-to-Humidifier
Connection:
Each individual Humidifier linked
to lead Unit.
Connection can be direct or
daisy-chained to other units.
(2) Network Connection:
Lead Unit wired to Local BMS.
Network activity verified.
(3) Controls Wired:
Directly to humidifiers.
10-50
Page 71
2008-08-28
(4) Start-Up Procedure:
Ensure power is being supplied
to the humidifier and Nortec
Online Module.
Verify power to NetBiter (Power
LED should be lit).
After power-up, verify network
communication.
Verify variable operation after
mapping is complete.
Perform regular humidifier
start-up check.
(4) Start-Up Procedure:
Verify power to NORTEC Links
module.
Verify power to I/O-Controller.
Adjust Network address dials to
desired address (BACnet/IP
address is preset at factory).
After power-up, verify network
communication.
Map desired network variables to
BMS.
Verify variable operation after
mapping is complete.
Perform regular humidifier start-
up check.

Advertisement

Table of Contents
loading

This manual is also suitable for:

NhpcNhtc

Table of Contents