If the system weighs 1701 kg (3750 lb). the rack weight distribution plate must be installed. To secure the
rack to the floor and install the weight distribution plate, see Appendix F, "Securing the Rack," on page
141.

Step 7. Install Subsystems in the 7040-W42 Frame

If subsystems were removed from the system rack to reduce weight to enable moving the rack to the
installation site, or if separate subsystem shipments were received, perform this step. System weight may
have been reduced because of either of the following conditions:
v Processor subsystems, I/O subsystems, integrated battery feature, and/or frame top extender were
shipped separately.
v Processor subsystems, I/O subsystems, integrated battery feature, and/or frame top extender were
removed to enable moving the system to its installation site.
To proceed with installation or reinstallation of subsystems, do the following:
1. Install or reinstall all of the system subsystems as described in Chapter 4, "Installation and Removal
Procedures," on page 39.
2. If the frame top extender was removed, reinstall the extender as described in Appendix I, "Removing
and Installing the Rack Top Frame," on page 171.

Step 8. Check the Cables

Cables may loosen during shipping. Check for loose cables before continuing the installation. Reconnect
any cables that are loose or disconnected.
12
Eserver pSeries 655 Installation Guide
2
3
1 Jam Nut
2 Leveler Foot
3 Rack Base (Front)