Cable Installation Procedure, Initial Setup - IBM pseries 655 Installation Manual

Table of Contents

Advertisement

Figure 1. Cable management bracket installation
1 Rear Cutout
2 Extender
3 Tailgate Insert

Cable Installation Procedure, Initial Setup

Note: Do not connect any switch cables to the nodes until instructed to do so.
1. Place the frame in position over the floor tile cutouts
v If the frame has 10 or more nodes installed, the movers will position the frame
2. Install the frame using the appropriate installation instructions
3. Verify that the cable management bracket is properly installed on the base at the rear of the frame, if
not:
a. Remove orange shipping bracket from the rear of the frame
b. Install the stiffener into the rear cutout on the base of the frame
162
Eserver pSeries 655 Installation Guide
4 Cable Management Backet
5 Stiffener

Advertisement

Table of Contents
loading

Table of Contents