IBM pseries 655 Installation Manual page 194

Table of Contents

Advertisement

a. Remove the five hex-head screws from the front BPE.
b. Remove the five hex-head screws from the rear BPE.
7. To reduce the weight to the maximum two-person limit, do the following:
a. Remove the eight screws around the perimeter of the top panels at the front and rear of the rack
top frame assembly. Remove the two top panels.
1 Top Panels for Front and Rear Rack Top Frame
2 Rack Top Frame
3 Left and Right BPE Rails
b. Carefully note the orientation and position of the foam and metal air baffle at the middle left side of
the rack top-frame assembly. Remove the screw, then tilt the baffle toward the front of the rack top
frame.
Note: The foam and metal air baffle must be reinstalled on the left side in its original location. The
foam baffle is a critical part for proper cooling of the BPEs.
c. Remove the single screw at each end of the cross brace. Remove the cross brace.
d. Remove the two screws at the front of the left BPE rail and remove the rail.
e. Remove the two screws at the rear of the right BPE rail and remove the rail.
178
Eserver pSeries 655 Installation Guide
1 Bulk Power Enclosure
2 Hex-Head Screw Locations
4 Foam and Metal Air Baffle
5 Rack Top-Frame Cross Brace

Advertisement

Table of Contents
loading

Table of Contents